Fujitsu MB2198-130 Network Card User Manual


 
25
Chapter 5 Usage
5.1 Setting up the Evaluation MCU Power Supply
5.2 Setting the Clock Supply Circuit
5.3 Setting Reset Signals
5.4 Setting a External Memory Emulation
5.5 Power-on/Shutdown Procedures
Note : Shut off power to the entire system before starting the operations descried in this chapter. Performing
such operations with the power on may result in electric shock or device faults.
This chapter describes the basic setup procedures to be followed before turning the power on and the power-
on and shutdown procedures as well.
Be sure to read this chapter before turning the power on.