Chapter 6 303
Installing/Updating the ITO Configuration on the Managed Nodes
Configuration Installation/Update on Managed Nodes
• Select only a few nodes at a time in the IP map, Node Bank, or
Node Group Bank window.
• In the Node Bank or Node Group Bank window, open the
Configure Management Server window by selecting
Actions: Server->Configure… This is shown in Figure
6-1. Set a low number in the Parallel Distribution field.
For more information, press F1 to see help on this field.
• Reduce the process priority of opcdistm (distribution manager)
on the management server using the renice(1) command.