Restrictions on Schedule function
NOTE
• If the Schedule is not executed, an error message will be sent in
accordance with the conditions set in Schedule Execution Error on Projector
Web Control. (
Network Guide → 3.1.6 Alert Settings)
• If the Schedule function is set to turn off the power when the projectors are
operating in Intellectual Stack, both the Main and Sub projectors will be turned
off.
• If the Schedule function on the Main projector is set to turn on the power, the
projectors will be turned on according to the LAMP MODE setting.
• When the two projectors are operating in the DUAL mode and a menu is being
displayed on one of the projectors, the Schedule function for My Image and
Messenger on the other projector will not be executed.
• Power Off in the table refers to turning off the power and entering the standby
mode according to the Intellectual Stack settings or by pressing the STANDBY
button on the remote control or STANDBY/ON button of the Main projector.
• The projectors cannot be turned on by the Schedule function on the Sub
projector. Set it on the Main projector if necessary.
• When the Sub projector is turned off according to the ALTERNATE MODE
setting, the Schedule function on the Sub projector to turn off its power will be
executed without error.
6. Restrictions on Schedule function (continued)
are operating in Intellectual Stack. If the input port to be changed according to
the Schedule function can be used in Intellectual Stack, the Schedule will be
executed. If not, it will not be executed.
X *2): This Schedule can be input to Projector Web Control when the projectors
are operating in Intellectual Stack but it will not be executed.
X *3):
This Schedule can neither be input to Projector Web Control nor be executed