MGE UPS Systems 1000 RT2U Power Supply User Manual


 
2.6 Connections with a FlexPDU (Power Distribution Unit) module (optional)
2.7 UPS Connection
Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source and the
true electrical consumption of the total load.
Note. The UPS charges the battery as soon as it is connected to the AC-power source, even if button (27) is not pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can supply
the rated backup time.
i
RT model
1. Connect the UPS socket (9) to the AC power
source using the power cable from the equip-
ments to be protected.
2. Connect the loads to the UPS.
It is preferable to connect the priority loads to the outlets
marked (8) and the non-priority loads to the outlets
marked (7) that can be programmed in pairs (1 and 2).
To program the outlets, the MGE Office Protection
Systems communications software is required.
Tower model
i
1. Connect the UPS socket (9) to the AC-power
source using the power cable from the equip-
ments to be protected.
2. Connect the input socket on the FlexPDU
module (48) to the UPS outlet (7) or (8). The
cable and the connectors are marked in red.
3. Connect the equipment to the outlets (45) and
(46) on the FlexPDU module. These outlets
differ, depending on the version of the FlexPDU
module.
4. Fit the connection securing system that prevents
the plugs from being pulled out accidentally.
7
45 46 48
8 9
Installation and User Manual
Installation
2 — 5
86-86700-00 A01
ENGLISH