32 E-Series Installation Manual
4.3 Pre-start checks
Before you perform any functional tests, please carry out the following pre-start
checks:
Radar
• Check that the scanner has been installed in accordance with the instructions con-
tained in the relevant handbook. All securing bolts should be fully tightened and
any mechanical locking arrangements, as specified, are in place.
• Ensure scanner and power connections have been made.
• If an open array is fitted, ensure that power is connected through a split cable to a
suitable circuit breaker and that the power switch located on the pedestal to set to
ON.
• All connecting wires are secured and protected as necessary.
Note:
If you are the boat’s owner and have installed the radar system, ask an authorized Ray-
marine dealer to check the installation before going to sea.
WARNING:Electromagnetic energy
The radar scanner transmits electromagnetic energy. Ensure
that the scanner has been installed according to the
recommendations in the relevant scanner handbook. Ensure all
personnel are clear of the scanner, before switching to
transmit mode.
Fishfinder
Ensure that the transducer cable is inserted and the bayonet connector locked onto the
DSM 300.
GPS
Check that the GPS has a clear view of the sky and is not obstructed e.g. by buildings,
bridges or other equipment fitted on-board.