Paradyne 9820 Computer Monitor User Manual


 
Monitoring
6-23
9820-A2-GB20-20
June 2000
PVC Connection Status
PVC connection statuses are selected from the Status menu.
Main Menu
Status
PVC Connection Status
Only PVC connections with Source DLCIs configured to be Active are shown.
PVC Connection Status Screen Example
main/status/connections 9820-45M
Device Name: Node A 05/13/2000 5:05
Page 1 of 2
PVC CONNECTION STATUS
Source Primary Destination Alternate Destination
Link DLCI EDLCI Link DLCI EDLCI Status LINK DLCI EDLCI Status
Port-1 201 Net1-FR1 300 1 Active
Port-1 202 Net1-FR1 1001 4 Active
Port-1 100 Net1-FR1 1001 2 Active
Port-1 204 Net1-FR1 1001 5 Active
Mgmt PVC Dunedin Net1-FR1 1001 3 Active
Port-1 206 Net1-FR1 1001 Active
Port-1 207 Net1-FR1 1001 Active west 400 Inactive
Port-1 208 Net1-FR1 500 Active west 302 Active
Port-1 209 Net1-FR1 502 Inactive west 304 Active
Port-1 210 Net1-FR1 504 Inactive
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
ESC for previous menu M
ainMenu Exit
R
efresh PgUp PgDn
If the No PVC Connections message appears instead of a list of PVC
connections, no PVC connections have been configured yet.
The Alternate Destination columns appear only for the Model 9820-45M.
Table 6-14. PVC Connection Status (1 of 2)
Field
Status What It Indicates
Link
Identifies the cross-connection of
DLCIs configured for the unit.
Net1-FR1 H Source/destination is frame relay
link 1 on Network 1 – the network
data port.
Port-1 H User data port – Port-1
.
Mgmt
PVCName
H Virtual circuit is a management
link that terminates in the unit,
where
Name
is the link name.