97707987 Rev A 21
2 Click on the Configuration tab. This allows you to configure:
• Minimum battery level before shutdown - Select the
minimum UPS battery level, in percent, prior to the SNAZ
shutting down from the drop-down list
• Minimum battery time before shutdown - Enter the
minimum UPS battery time remaining, in minutes, prior to
the SNAZ shutting down.
3 Click to save the changes and, as appropriate, click
to start or click to stop the service.