1-1
PreparingforInstallation
1
This chapter describes how to prepare your site for these systems:
• Ultra Enterprise 6000 system — 16-slot cabinet server
• Ultra Enterprise 5000 system — 8-slot cabinet server
• Ultra Enterprise 4000 system — 8-slot standalone server
See Figure 1-1 on page 1-2 for diagrams of the cabinet and standalone servers.
The tasks for installing the systems are:
1. Unpacking the cabinet server — Chapter 1
2. Preparing the site — Chapter 1
3. Preparing the servers — Chapter 1
4. Cabling — Chapter 2
5. Powering on — Chapter 3
6. Using the software — Chapter 4
Note – For information about physical specifications, electrical specifications,
and environmental requirements, refer to Appendix A, “Specifications,” in the
Ultra Enterprise 6000/5000/4000 Systems Manual.