The next step involves migrating the version 5 hub.
The next step involves enabling the replication agreements to the new hub and initializing the
hub if necessary.
5.x Master A 5.x Master B
5.x Hub A 5.x Hub B
6.0 Consumer A
6.0 Hub A
6.0 Consumer B
FIGURE4–7 Migrating theversion 5 Hub
MigrationScenarios
Chapter4 • Migrating aReplicatedTopology 59
SunCondential:Registered