14 INTRODUCING THE BASELINE SWITCH
Package Contents
Before installing and using the Switch, verify that your
Switch package is complete. The Switch comes with:
■ One power cord
■ Four standard height, self-adhesive rubber pads
■ One mounting kit
■ Installation CD
■ This User Guide
■ Warranty flyer
The Switch is powered from the AC supply.
If any of the above items are damaged or missing,
contact your 3Com network supplier immediately.