Operation – Operation Procedures
8 Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation 990-2282A-001
Turn the internal mechanical bypass
lever upwards to activate it. The load
will now be supported directly by
utility/mains power.
Reinstall the Front Panel.
Single System – turning into external bypass.
Warning
In bypass operation the batteries are still powered. If a total power off is required the batteries
must be pulled out to the red disconnect line, see the section How to perform a total power off.
From the external MBP: Turn the bypass
switch
(Q003) to position “1” (ON).
From the external MBP: Turn the output
switch (
Q002) to position “0” (OFF).
If the UPS has to be completely isolated/
removed, see the section How to perform a
total power off.
Chrg 100%
Load 000%
xxxVin 000Vout x0Hz
Runtime: 0hr 0m
Press
Control
Status
Setup
Logging
Display
Diags
Help
Use
Press
UPS into Bypass
Do Self Test
Simulate Power Fail
Start Runtime Cal
Use
Press
Confirm:
UPS into Bypass
NO, ABORT
YES, UPS into Bypass
Use
Press