Operation – Operation Procedures
990-2282A-001 Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation 19
How to perform a restart
Restart – single system wihout external MBP.
Set the utility/mains breaker to the ON position.
If your installation includes an XR Battery Enclosure (SUVTBXR2B6S/SUVTBXR6B6S) with a
DC disconnect switch, set the DC disconnect switch to the
ON position.
After system boot-up, the display will automatically ask you to confirm/select voltage and frequency as
shown in the following.
Voltage confirmation. At restart, the display will prompt you through the following screens:
Warning
Only trained personnel familiar with the construction and the equipment may
restart the UPS.
Note
Wait approximately 30 seconds for the system to boot up and carry out a self test.
When the Confirm Voltage prompt appears on
the screen, go to the desired voltage using the
UP/
DOWN keys and press ENTER.
When the prompt Apply load appears, go to Yes
using the
UP/DOWN keys and press ENTER if you
want the UPS to provide a load output now. (If
you do not want UPS load output at this point, go
to No).
The green (LOAD ON) LED is now lit. Press ESC
two times and the display will show the above
Overview Screen.
Note
The UPS is now ready to support the load.
Confirm Voltage
Use 400V
Yes, use 400V
No, select another
Use
Press
Apply load?
Yes
No
Use
Press
Chrg xxx% ||||||||||
Load xxx% ||||||||||
xxx Vin xxxVout xxHz
Run-time: xxhr xxmin