APC VT Power Supply User Manual


 
Maintenance – Parts Replacement
32 Smart-UPS® VT 10-40 kVA 400V, 208V, 200V – Operation 990-2282A-001
Install the Battery Module in the lowest
available bay (four across in 523 mm/(20 in)
UPS versions, two across in 352 mm/(14 in)
UPS versions).
Position the Battery Unit to slide in between
the grooves and push completely into the
UPS to ensure connection.
Note
If a problem is reported, ensure that the modules in question are correctly installed. If the
problem persists, see the section Troubleshooting.
Note
Allow for a 24-hour recharging period of the batteries after system start-up.
UPS / XR