ATEN Technology CL1758M Switch User Manual


 
Chapter 2. Hardware Setup
15
Two Stage Installation Diagram
Note: The Power On sequence requires that all Second Stage units be powered
on first. After all the Second Stage units have been powered on, then the
First Stage unit must be powered on next. After the Second and First
stage units have been powered on, the computers can be powered on.
F/W UPGRADE
NORMAL RECOVER
CL-1758
CS-1758