ATEN Technology KH98 Switch User Manual


 
Chapter 2. Hardware Setup
13
Note: The Power On sequence requires that all First Stage units be powered
on first. After they are all on, the Second Stage units must be powered
on next. After all the Second Stage units are on, the Third Stage unit
must be powered on. After completing this sequence, power on the
computers.
LAN
POWER
LAN
POWER
BMC BMC
BMC BMCBMC
BMC
LAN
(Out of Band)
(Out of Band)
(Out of Band)
LAN
POWER
BMC BMCBMC
BMC
KH98.book Page 13 Thursday, April 26, 2007 5:48 PM