3. Installation Guidelines
A
Image 3-24
Mounting the security chain
Image 3-25
Mounting the security hook
C
B
B
Image 3-26
Mounting the security hook (detail)
How to open a secured rigging point?
1. Push the ring (A) of the first projector downwards and hold it in that position. (image 3-27)
2. Turn the locked part (B) of the second projector a quarter counter clockwise and move it upwards.
28
R5976801 SLM R9+ 20/10/2004