Cisco Systems 2960S-24TS-S Switch User Manual


 
2-9
Catalyst 2960-S Switch Hardware Installation Guide
OL-19732-04
Chapter 2 Switch Installation
Planning a Switch Stack
Figure 2-7 Stack with Half Bandwidth Connections
Figure 2-8 shows a stack with a bad FlexStack cable in link B. This stack provides only half bandwidth
and does not have redundant connections.
Figure 2-8 Stack with a Failover Condition
Figure 2-9 shows a stack with a bad link B. This stack partitions into two stacks, and switch 1 and
switch 3 are stack masters.
Figure 2-9 Partitioned Stack with a Failover Condition
A
B
206702
A
B
206703
C
A
B
206704