Cisco Systems 2 Network Router User Manual


 
640 - 607
Leading the way in IT testing and certification tools, www.testking.com
- 144 -
In store and forward mode, the switch must receive the complete frame before forwarding takes place. The
destination and source addresses are read, the cyclic redundancy check (CRC) is performed, relevant filters are
applied, and the frame is forwarded. If the CRC is bad, the frame is discarded. The latency (or delay) through
the switch varies with frame length.
Incorrect Answers:
A: Is wrong because the latency changes with the frame size.
D: Is wrong because it waits for the complete name and not merely the destination address.
Steve McQuerry. Interconnecting Cisco Network Devices. (Cisco Press: 2000) page 162.
Q. 234
You are configuring a new catalyst switch that you want to manage remotely from workstations on other
network segment within your enterprise.
Which of the following are required to allow remote management of the switch over IP? (Choose two.)
A. The Frame Relay encapsulation on the physical interface.
B. The local DLCI on each subinterface.
C. An IP address on the physical interface.
D. The subinterface type as point-to-point
Answer: C
Q. 235
Which sequence of actions will allow telnetting from a user's PC to a router using TCP/IP?
A. Connect the PC's COM port to the router's console port using a straight-through cable.
B. Connect the PC's COM port to the router's console port using a crossover cable.
C. Connect the PC's COM port to the router's Ethernet port using a straight-through cable.
D. Connect the PC's Ethernet port to the router's Ethernet port using a crossover cable.
E. Connect the PC's Ethernet port to the router's Ethernet port using a rollover cable.
F. Connect the PC's Ethernet port to the router's Ethernet port using a straight-through cable.
Answer: D