Extreme Networks 12804 Switch User Manual


 
Repacking a BlackDiamond Chassis
BlackDiamond 12800 Series Switches Hardware Installation Guide
126
Repacking the BlackDiamond 12804 Chassis
To repack the BlackDiamond 12804 chassis:
1 Remove all modules and power supplies from the BlackDiamond 12804 chassis. Follow correct
Extreme Networks procedures for removing components.
2 Using four rack mounting screws, attach the 19-inch helper bracket to the system rack immediately
below the chassis.
3 Remove the eight rack mounting screws that secure the chassis to the system rack.
4 On each side of the chassis, place one hand in the empty power supply bay and the other hand in
the rear slot on the back panel of the chassis.
CAUTION
Do not use the fan tray handle to lift or maneuver the BlackDiamond 12804 chassis. This handle is not designed to
support the weight of the chassis.
5 Slowly guide the chassis out of the system rack using the helper bracket for support.
6 Carefully lift the chassis off the helper bracket and lower it onto the foam cushion in the shipping
carton base (see Figure 81.)
Figure 81: Setting the BlackDiamond 12804 Chassis onto the Foam Cushion
EX_129