Extreme Networks 12804 Switch User Manual


 
Installing Power Supply Units
BlackDiamond 12800 Series Switches Hardware Installation Guide
76
Installing an Extreme Networks 1200 W DC PSU
To install an Extreme Networks 1200 W DC PSU:
1 Attach an ESD-preventive wrist strap to your wrist and connect the metal end to the ground
receptacle on the top-left corner of the switch front panel.
CAUTION
Be sure that the grounding point on the back of the switch is securely connected to earth ground. For information
about grounding the switch, see “Grounding the BlackDiamond 12800 Series Chassis” on page 68.
2 Verify that the 1200 W DC PSU is right side up, and press the yellow locking lever to the left while
lifting the handle (see Figure 41).
NOTE
Do not connect the input DC cable to the DC PSU before inserting the DC PSU into the switch.
Figure 41: Locking Handle on the 1200 W DC PSU
EX_130
Open
Lock
Yellow
lever