GBC 930-032 Laminator User Manual


 
Operations Manual: Installation
Voyager 3
Voyager 3
2004 General Binding Corporation
Page 4-7
Feeder
Once the feeder has been safely removed from the
crate, you can move the feeder into position by
using a pallet jack or forklift.
To move the feeder, approach the feeder from the
front and guide the forks under the feeder where
indicated on the cross beams.
Set the back of the feeder approximately 48 in. (122
cm) from the front of the laminator. This will provide
sufficient space for the installation of the conveyor.
INFORMA
TION: Do not remove the cross
beams. They will be removed at the time of
installation.
Conveyor
The conveyor can be easily carried by two people
and set down on the floor between the feeder and
the laminator. The belt drive gear end of the con-
veyor should be on the feeder end. The conveyor
will be connected at the time of installation.
Vacuum/ pump
The vacuum/ pump can moved by placing it on to a
pallet jack and moved to the set up location.
Set the vacuum/ pump next to the control panel on
the operator side of the laminator. The vacuum/
pump will be connected at the time of installation.
Water heater/ reservoir tank
The water heater and reservoir tank are equipped
with castors and can be rolled over flat surfaces and
placed next to the laminator.
Set the water heater and reservoir tank next to the
electrical box on the drive side of the laminator.The
water heater and reservoir tank will be connected
at the time of installation.
CA
UTION: Tripping Hazard. Position water
heater so that hoses from heater do not
cause a tripping hazard.
CAUTION: Ensure all accessory items are
placed with the GBC Voyager 3. Do not
attempt to connect any component after
positioning has been completed.
Fork Lift
48 in.
(122 cm)