GE 20 Power Supply User Manual


 
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc 69/88 Operating Manual
SG Series
10, 20, 30 & 40 kVA
7.4.3 From Manual Bypass (Q2) to normal function On-line
Initial status: Load supplied from Manual Bypass.
All Q2 of the system closed
.
First operated unit All other units of the system
1. Connect the Battery to all Units by closing the external Battery Switch(es) or
Fuses.
2. Close Q1 (Pos. I) on all Units.
The Rectifiers will start automatically and at the closure of Q1 of the last Unit, the
Bypass of all Units will be activated.
First operated unit All other units of the system
3. Open Q2 (Pos. O) on all Units
.
First operated unit All other units of the system