GE 20 Power Supply User Manual


 
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc 74/88 Operating Manual
SG Series
10, 20, 30 & 40 kVA
3. Disconnect the Battery from all Units.
Wait 5 minutes for DC-Link Capacitors discharge.
First operated unit All other units of the system
4. Disconnect the Utility supply from all Units.
All LED’s are OFF.
First operated unit All other units of the system
End of procedure