1-28
Installing the Tape Library
Moving or Shipping the Library
Moving or Shipping the Library
This section explains how to move the library a short distance, such as to another
office or to another floor in the building and how to ship the library to another
location.
WARNING The library weighs approximately 100 pounds (45 kilograms). To avoid
personal injury and possible damage to the library, at least two people must
move the library.
To move or ship the library:
1. Properly shut down and power off the host.
2. Unmount (unreserve) any tape cartridges in the library if necessary. See your
computer operating system documentation, or software application
documentation for instructions on how to unmount tape cartridges.
3. Verify that all drives in the library are empty:
If the drives are full, empty them before shipping the library. (For instructions,
refer to the software documentation your host system uses to manage the
library.)
4. Switch off the power switch on the library front panel.
CAUTION Do not switch off power to the library until the SCSI bus is inactive.
Removing power from a SCSI peripheral when the bus is active can result in data
loss and/or indeterminate bus states. (Check your host system manuals for
information about checking the SCSI bus status.) If your computer is connected to a
LAN, be sure to check with your system administrator before shutting off power to
the library.
5. Remove the power cord and the SCSI cable connections from the library rear
panel.