Hitachi 8880R Server User Manual


 
Ch 2: System Environment Setting
Hitachi VisionBase 8880R Server 43
3.
The [Card Category] list box like the one below is displayed. From the [Card Category] list box, select
[Communication] and then choose [OK].
4.
In the [Add Communication Card] dialog box, select [Communication Board] (or [HENKAN Board]), and then
choose [OK]. A dialog box like the one below is displayed.
5.
If there is a conflict with resources in use, the following message is displayed. In such a case, choose [OK], and
then referring to “Changing the Settings in Extended Boards” on page 44, change the settings for the extended
board already installed.
6.
A dialog box for confirmation is displayed. Choose [OK].
7.
The [Card Resource Usage] dialog box is displayed; record the contents of that dialog box, and then choose [Close].
8.
The [ISA Configuration Utility] window is displayed. On that window, check that the extended board has been
added.
9.
From the File Menu, choose [Exit].
10.
A message is displayed. Choosing [Yes] will save the system configuration data file “SYSTEM.IMG” into DISK2.
11.
A termination message is displayed. Turn the power off.
12.
Referring to the manual attached to the ISA board, change the setting for the extended board to the values
recorded in step 7.
13.
Install the extended board on the expansion slot (ISA). When you restart the system equipment, the extended
board is usable.
NOTE:
When you need to install an extended board in or remove it from the system equipment, call the
maintenance personnel.
Built-in devices must be added or exchanged by maintenance personnel only. Be sure to avoid
removing the cover and installing/removing built-in devices. Otherwise, operation of the equipment
shall not be guaranteed.
Card Category
Select Card Category
CancelOK
Network
Mass Storage
Video
Communication
Multifunction
[ ]
Add Communication Card
Select Board:
OK Cancel Advanced... Help
Communication board
HENKAN Board
Unlisted Card
[ ]
OK
Help
ISA Configuration Utility
This operation cannot be
completed because of a
resource conflict. One
conflicting card is
Motherboard System Devices.
The conflict with that card
is Interrupt 4, but there
may be other conflicts.
[ ]