Definitions 2-13
Equipment relief
-
When additional equipment is installed, assignments should be concentrated
into the new loop or shelves until the first threshold study. At that time, the
loop profile would be updated and a new loading plan developed. At any
time when a loop exceeds 500 CCS (based on 85% traffic level), that loop
should be suspended from future assignments. If any loop should encounter
service problems, that loop should be suspended and sufficient load
removed to reduce service levels to an acceptable level.
Assignment records
The following printouts are available from the system and should be used in
addition to worksheets to assist in maintaining assignment records:
-
list of trunk route members
-
list of TN blocks
-
list of unused card positions
-
list of unused units
-
DN to TN matrix
Refer to
Xl1
Features
and
services
(553-3001-305) for information on how
to obtain and manipulate data in the SL-1.
System engineering 553-3001-l 51
c