MRV Communications, Inc. – Installation Manual
30
Infrastructure
The only infrastructure required for operating the transceiver and
linking the sites is Power and Data/Signal connection to the
peripheral networking equipment. This must be ready prior to the
airlink installation
.
IN OUTDOOR INSTALLATIONS, USE SHIELDED AND
WEATHERPROOF MATERIALS (CABLES, INLETS, AND
CONNECTORS) COMPLIANT TO THE SAFETY STANDARD IN
FORCE.
Power
Source
The power requirement for standard units is 100-240VAC @
50/60Hz - 22W.
Note: Units requiring low Voltage: 35-60VDC - 22W can be factory
set upon request.
It is recommended to use Surge Suppression System to avoid
the damage to the equipment when power supply is unstable.
Protection should be at least 25,000A min.
Cabling
Standard 3 conductors power cord are required. (See Safety
requirements, Page iv)
Data/Signal Cabling
1. For TS5000/G, TS5000/G-F, TS5000/155 and TS5000/155-F
Type
For connecting the Transceiver to the peripheral equipment two optical
fiber cables are required (one for the transmission and one for the
reception). The standard recommended cable is a 62.5/125 μm for MM
fiber and 9/125 μm SM fiber, according to transceiver type used.
Connectors
Each fiber should be terminated with the ordered type of connector on the
transceiver end (SC, ST….).
Optical Fiber testing.
The cabling installer must specify the attenuation of each fiber installed.
Chapter
3