NEC 320Lb Server User Manual


 
2-2 Setting Up the System
Overview
This chapter describes how to select a site, unpack the server, make cable
connections, and power on the tower-based or rack-mount server units.
Selecting a Site
The server operates reliably in a typical office environment.
Choose a site that is:
! Near grounded, three-pronged power outlets.
Note: For the United States and Canada, this means a
NEMA 5-15R outlets for 100-120 VAC. For other
international sites, this means three-pronged power outlets
applicable for the electrical code of the region.
!
WARNING
Be sure the power service connection is through a properly
grounded outlet.
!
CAUTION
The power plugs must be plugged into the same common
ground power outlets.
! Clean, dust-free, and well ventilated. Front and rear ventilating openings
kept free of obstructions. Away from sources of heat, vibration or
physical shock.
! Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
! Spacious enough to provide at least 15 inches (38.1 centimeters) behind
and on each side of the server and at least 32 inches (81.3 centimeters) in
front of the server for proper cooling, airflow, and cable clearance.
! Easily accessible for server maintenance and installation of server
upgrades.