Paradyne 7975 Network Card User Manual


 
Testing
5-2
7975-A2-GB20-40
December 1998
Running Network Tests
Network tests require the participation of your network service provider. To
access the Network Tests screen, follow this menu selection sequence:
Main Menu
Test
Network Tests
main/test/network Hotwire
Model: 7975
NETWORK TESTS
Test Command Status Results
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Local Loopbacks
Line Loopback: Start Inactive 00:00:00
Repeater Loopback: Start Inactive 00:00:00
Remote Loopbacks
Send Line Loopback: Down
Send Inactive 00:00:00
Pattern Tests
Send and Monitor 511 Stop Active hh:mm:ss - Errors 99999+
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu M
ainMenu Exit
R
esetMon
Use the Command column to start or stop a test. When the Status column
shows that a test is Inactive, Start is displayed; when a test is Active, Stop is
displayed. Position the cursor at the desired Start or Stop command and press
Enter.
Selecting a Stop command on the Network Tests screen or Abort All Tests from
the Test menu will not disrupt a network-initiated loopback.
The Results column displays the test duration.
When the Send and Monitor 511 test is active, R
esetMon is available to reset the
error counter to zero.