Paradyne 7975 Network Card User Manual


 
Testing
5-7
7975-A2-GB20-40
December 1998
Running SYNC Data Port Tests
To access the SYNC Data Port Tests screen, follow this menu selection
sequence:
Main Menu
Test
SYNC Data Port Tests
main/test/data Hotwire
Model: 7975
SYNC DATA PORT TESTS
Test Command Status Results
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Local Loopbacks
Data Terminal Loopback: Start Inactive 00:00:00
Data Channel Loopback: Start Inactive 00:00:00
Remote Loopbacks
Send Remote DCLB: Down
Send Inactive 00:00:00
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu M
ainMenu Exit
Use the Command column to start or stop a test. When the Status column
shows that a test is Inactive, Start is displayed; when a test is Active, Stop is
displayed. Position the cursor at the desired Start or Stop command and press
Enter.
The Results column displays the test duration.