Pitney Bowes DM575 Postal Equipment User Manual


 
9 • Maintaining and Updating
9 - 10 SV62201 Rev. C
12. Replace the E-Z Seal
®
Sealing Solution bottle.
Gently tap the top of the
solution bottle.Wait for
about 5 minutes and
then check to make sure
the moistener tank is
filled with the correct
amount of E-Z Seal®
solution. Measure the
amount of solution as
shown in the diagram on
the right.
The solution level
should be:
14-18mm(0.55-0.71 in.)
If after another 5 min-
utes the level is still not
correct, go to step 13.
Otherwise go to step 14.
13. Remove the moistener
tank and hold it as high as
you can above the machine
as shown in the picture on
the right.
Hold it in this position for
approximately 20 seconds.
a. Replace the moistener
tank again and gently
slide it back into the
machine, taking care
not to crimp the supply
tubing. Do not push the
tank all the way back
into the machine yet.
b. Wait about 5 minutes and then check the level of E-Z Seal® Sealing
solution again as described in step 12.
Solution level