Planet Technology FGSW-2402PVS Switch User Manual


 
30
Figure 4-4 Port Configuration Screen
After setup is completed. Press "Apply" button for save the current configuration. The screen figure 4- 5
appears with message “Operation completed successfully!”
Please be reminded, the operation of port#25, port#26 will base on the setting in table 3-4.
Figure 4-5 Port Configuration save successfully Screen
Press “Back” for back to previous web screen.
"2%
This function allows to configuring the trunk function. It provide up to 7 trunk groups and each trunk for up to
maximum 4-ports. The screen in figure 4-6 appears.
Figure 4-6 Trunk Configuration Screen
After setup is completed. Press "Apply" button for save the current configuration. The screen in figure 4- 7
appears with message “Operation completed successfully!”
Figure 4-7 Trunk Configuration save successfully Screen
Press “Back” for back to previous web screen.