MGC-25 Getting Started Guide
3-6
Starting the MGC Manager
The MGC Manager can connect to several MGC units simultaneously. The
first time you run the MGC Manager application, or when a new MCU is
added to your configuration, you must first define each MCU’s IP address and
listening port number.
To define an MGC connection:
• On the Start - Programs menu, click MGC Manager ver 9.0, and then
click MGC Manager ver 9.0 to start the application.
The MGC Manager main window opens.
Installing the
MGC Manager
Initial IP
Configuration
Connecting
to an MCU
Configuring the
Network Services
Defining an MCU
Starting the MGC
Manager
The MGC unit has to be installed and its IP address properly configured
before defining its connection parameters in the MGC Manager
application. For details, see “Initial IP Configuration” on page 3-1 in this
guide.
Main Menu
Toolbars
Status pane
Monitor pane
Browser
pane