Installation
11
Powerware
®
9120 User's Guide S 05147426 A Uncontrolled Copy
12. Connect the output and ground wires to the output terminal
block (see Figure 3).
OUTPUT
INPUT
N
L
N
L
Input Connections
Output Connections
Line
Ground
Neutral
Line
Ground
Neutral
Figure 3. Terminal Block
13. Replace the terminal block cover.
14. Switch the main utility breaker on.
15. To start the UPS, press and hold the
button until you hear
the UPS beep (approximately one second). The LCD briefly
displays
On Delay and the
indicator illuminates. Then the
UPS conducts a selfĆtest, briefly displaying
On BATTERY. If an
alarm condition occurs, see Table 10 on page 37.
When the self-test is complete, the LCD displays On Line
indicating that power is available from the UPS output
receptacles.
16. If you installed optional EBMs, configure the number of EBMs
through the front panel so that the UPS can estimate the
available battery run time (see Configuration Mode" on
page 17).
NOTE The batteries charge to 90% capacity in approximately 4 hours. However, it is
recommended that the batteries charge for 6 to 24 hours after installation or long-term
storage.