Xantrex Technology ACCB Power Supply User Manual


 
Pre-installation
975-0046-01-01 1–7
Pre-installation
Location
Be sure to allow sufficient space for the ACCB to be mounted directly
adjacent to the inverter’s AC side. Also consider the additional weight
and ventilation space requirements of the ACCB.
Ventilation Requirements
Minimum clearance for ventilation around ACCB must be at least
6 inches (152 mm) at the end and at the top. The minimum clearance is
needed to prevent recirculating hot air from the inverter’s exhaust (DC
side) from going back into the inverter’s intake (AC side).
For maximum ventilation, 12 inches (305 mm) is recommended around
the top.
Please refer to the Sine Wave Plus Inverter/Charger Owner’s Guide for
additional location considerations.
WARNING
Ensure that no DC voltage is being supplied to the inverter and that no AC
voltage is present on the AC wiring. Failure to do so could cause serious injury or
death.
Figure 1-4
Clearance Requirements for Ventilation
DD
Set In verter
OFF SRCH ON CHG
Sine Wave Plus Inverter / Charger
AC Conduit Box
ON
OFF
ON
OFF
6" (152 mm)
Minimum Required
6" (152 mm)
Minimum Required
12" (305 mm)
Recommended