Test ing
View Test Log
Run/View Test
View Test Log
Run/View Test
Test Schedule
Test Duration
Displays all logged test results in a scrolling list. For each item, the screen provides the Gen Start test and
the Load Test results with a date and time stamp of when the test occurred.
Use this menu to run a test now, or to view a test that is in progress.
Engine Start Test If a test is in progress, the screen displays Test Progress and the time remaining in
the test. If you want to stop the test, select the
ABORT NOW? item on this screen
and then press
ENTER.
If you want to run a start test now, select Run Test Now from the confirmation
screen and then press
ENTER. The test will run based on the parameters set on the
Test Duration menu. If you do not want to run a start test now, choose No from the
confirmation screen and then press
ENTER.
System Load Test If a test is in progress, the screen displays Test Progress and the time remaining in
the test. If you want to stop the test, select the
ABORT NOW? item on this screen
and then press
ENTER.
If you want to run a load test now, select Run Test Now from the confirmation
screen and then press
ENTER. The test will run based on the parameters set on the
Test Duration menu. If you do not want to run a load test now, choose No from the
confirmation screen and then press
ENTER.