American Power Conversion 250 A Power Supply User Manual


 
InfraStruXure Power Generation System 19
Operation
Automatic Operation
How to place the InfraStruXure Power Generation System in automatic operation
1. Ensure utility power is available. If the utility is not available, the ATS will signal the generator
to start.
2. Ensure the
/Manual/Auto switch on the generator control panel is in the Auto position.
3. Set the ATS Automatic Operation switch to Enable.
4. Ensure the Not In Automatic Operation LED is unlit (see page 21 for information about
uncommon behavior of this LED).
“How the InfraStruXure Power Generation System Operates” on page 6 summarizes
automatic operation of the InfraStruXure Power Generation System.