American Power Conversion InfraStruXureTM System Power Supply User Manual


 
22 InfraStruXure System—Installation and Start-Up
Attach the PDU, UPS, and Battery Enclosure
1. Move the PDU, Symmetra PX UPS, and Battery Enclosures into position, aligning the holes in
the adjacent side panels.
2. Level the PDU, Symmetra PX UPS, and Battery Enclosure by using a level and adjusting the
leveling feet on each enclosure.
3. Thread the chase nipple (part number: 820-0071) through the opening in the adjacent side
panels of the enclosures. The following enclosures will need to be attached:
An adjacent PDU and UPS
An adjacent Battery Enclosure and UPS
Adjacent Battery Enclosures
4. Tighten the lock-nut and the bushing on the chase nipple.