American Power Conversion InfraStruXureTM System Power Supply User Manual


 
Appendix A : System Operation
78 InfraStruXure System—Installation and Start-Up
9 . To apply power to the PDU distribution panel,
close (turn ON) the Q2 circuit breaker on the PDU.
10. To apply power to the PDU power cords and
connected equipment, close (turn ON) the
distribution panel circuit breakers.
11. If applicable, close (turn ON) the Cross Tie
Output (X) circuit breaker.