American Power Conversion PD150L6F Power Supply User Manual


 
Operation: How to Apply Power to the System
32 150kW InfraStruXure PDU—Operation and Configuration
c. Close (turn ON) the subfeed breakers (if applicable).
b. Close (turn ON) the PDU distribution
panel circuit breakers.
Note
When the distribution panel circuit breakers are closed (turned ON), the PDU
power cables and connected equipment are energized.