Avery 204 Label Maker User Manual


 
6
CONTENTS
1.2 SAFETY INSTRUCTIONS
ALS
20x
256
GB
1.2.3 Before beginning production
Due diligence of the operating company
and the service technician
£ Ensure that the following prerequisites are fulfilled in
accordance with the service instructions:
The machine is installed properly and configured in
accordance with the guidelines.
All required safety mechanisms have been installed.
The unit has performed at least one successful test
run.
The unit is connected to the power supply.
£ The users have the required personal protective
equipment, for example, a hairnet. Ensure that the
protective equipment is utilised correctly.
Due diligence of the user
£ Check that the safety installations are working
properly.
£ Inspect the machinery for any visible damage.
Report any ascertained defects immediately.
£ Use the required personal protective equipment
correctly, for example, wear a hairnet.
£ Remove any unnecessary materials and objects
from the operating area of the unit.
£ Ensure that only authorised persons are within the
operating range of the machine.
£ Ensure that starting up the machine will not injure
anyone.