Cisco Systems ME 3400 Switch User Manual


 
2-14
Cisco ME 3400 Ethernet Access Switch Hardware Installation Guide
OL-7677-04
Chapter 2 Switch Installation
Installing the Switch
After the switch is mounted in the rack, you need to do these tasks to complete the installation:
Power on the switch. See the “Verifying Switch Operation” section on page 2-5.
Connect to the RJ-45 connector of a dual-purpose port and run the Initial Configuration Dialog. See
the Cisco ME 3400 and ME 2400 Ethernet Access Switches Getting Started Guide for instructions.
Connect to the front-panel ports. See the “Connecting to the 10/100 and 10/100/1000 Ports” section
on page 2-20 and the “Connecting to SFP Modules” section on page 2-21 to complete the
installation.
We recommend attaching the cable guide to prevent the cables from obscuring the front panel of the
switch and the other devices installed in the rack. Use the supplied black screw shown in Figure 2-8
to attach the cable guide to the left or right bracket.
For configuration instructions about using the CLI setup program, go to Appendix D, “Configuring the
Switch with the CLI-Based Setup Program.”
Wall-Mounting
To install the switch on a wall, follow the instructions in these procedures:
Attaching the Brackets to the Switch for Wall-Mounting, page 2-14
Mounting the Switch on a Wall, page 2-15
Attaching the Brackets to the Switch for Wall-Mounting
Figure 2-10 shows how to attach a 19-inch bracket to one side of the switch. Follow the same steps to
attach the second bracket to the opposite side.
Figure 2-10 Attaching the 19-inch Brackets for Wall-Mounting
1 Phillips flat-head screws
C
isco M
E
2
4
00
S
ER
IES
1
2
132690
1