Cisco Systems SFS 7024 Switch User Manual


 
1-15
Cisco SFS 7024 InfiniBand Server Switch Hardware Users Guide
OL-8794-05
Step 3 Lift the switch and from the front of the cabinet, slide it onto the rails. The fans and power supplies are
on the front of the chassis; leaf modules are to the rear.
Caution Never lift the switch with the handles on the spine modules, leaf modules, power supplies, and fan trays.
These handles are not designed to support the weight of the SFS 7024.
Step 4 Tighten the screw on the bottom of each side of the chassis into the corresponding bottom hole of the
front flange of each rail.
Figure 3 Secure Chassis to Rail
Step 5 On each side of the chassis, install a screw and caged nut into the three holes in the chassis sheet metal.
Figure 4 Secure Chassis to Rack
Step 6 Attach the top support rails to the chassis rear side as shown in Figure 5:
Install 1 screw into
bottom hole on each rail
Install 1 screw and
caged nut into each
hole in the chassis
sheet metal