Enterasys Networks 8000/8600 Network Card User Manual


 
Installing the Hardware
58 Enterasys X-Pedition 8000/8600 Getting Started Guide
2. Along with an assistant, lift the chassis into place in the mounting rack.
3. While your assistant holds the chassis in place, use the #2 Phillips screwdriver and four #2
Phillips screws to attach the mounting brackets to the mounting rack.
Note: Make sure there are at least 3 inches (7.62 centimeters) of room above and behind the unit
for air flow to the cooling fans.
Caution: Make sure the screws are tight before your assistant releases the chassis. If you
accidentally leave the screws loose, the chassis can slip and fall, possibly becoming damaged.
Installing an AC Power Supply
The primary AC power supply is shipped separately from the X-Pedition chassis. To install or
replace the primary AC power supply or if you want to install a redundant power supply, use the
following procedure. You will need a #2 Phillips screwdriver to perform this procedure.
Note: Use a single-phase grounded power source located within 6 feet (1.89 meters) of the
installation site.
AC Power Supply Specifications
The following table lists the physical specifications for the X-Pedition’s AC power supplies.
X-Pedition 8000 X-Pedition 8600
Dimensions 2.5 in. H x 7.70 W x 11 D
6.35 cm H x 19.56 W x 27.94 D
5.05 in. H x 7.70 W x 12.28 D
12.83 cm H x 19.56 W x 31.19 D
Weight 6 lbs
2.73 Kg
11 lbs
4.99 Kg
AC Power 100-125 VAC, 5A maximum
200-240 VAC, 3A maximum
50/60 Hz
100-125 VAC, 10A maximum
200-240 VAC, 6A maximum
50/60 Hz
Output Wattage
At 3.4 V
At 5.1 V
At 12 Volts
390 Watts
70 Amps
25 Amps
2 Amps
780 Watts
140 Amps
50 Amps
4 Amps
Operating
Temperature
Fahrenheit: 41
o
F to 104
o
F
Centigrade: 5
o
C to 40
o
C
Fahrenheit: 41
o
F to 104
o
F
Centigrade: 5
o
C to 40
o
C