Options Guide 7
2Procedure
V CAUTION!
● The actions described in this manual should only be performed by
engineers, service personnel or technical specialists.
● Equipment repairs should only be performed by authorized, qualified
staff.
● Any failure to observe the guidelines in this manual, and any unautho-
rized openings and improper repairs could expose the user to risks
(e.g. electric shock, fire hazards) and could also damage the
equipment.
● Please note that any unauthorized opening of the device will result in
the invalidation of the warranty and exclusion from all liability.
Ê First of all please familiarize yourself with the safety instructions in the
chapter “Safety Instructions” on page 9ff.
Ê Make sure that all required manuals (see “Additional documentation about
the server” on page 1) are available, printing out the PDF files if necessary.
You will definitely need
– the Operating Manual for the server and
– the Service Supplement for the server
– the Technical Manual for the system board.
Ê Shut down the server correctly, switch it off, pull out the power plug, and
open the server as described in the chapter “Preparation” on page 15ff.
Ê Extend or upgrade your server as described in the relevant chapter.
I How to install/remove the hot-plug components is described in the
Operating Manual for the server.
Ê Close the server, plug all mains plugs into the power outlets, and switch on
the server as described in the chapter “Completion” on page 45ff.
Ê Start the operating system and, if necessary, configure it as required (see
the Operating Manual).