HP (Hewlett-Packard) AA-RSB6B-TE Switch User Manual


 
Installing the SAN Switch 2/8
34 hp StorageWorks SAN Switch 2/8 Installation Guide
2. Repeat steps 1a through 1d to attach right front bracket (Item 8) to the right
side of the switch, see Figure 6.
Figure 6: Attaching the Fixed Rack Mount Kit rails to the switch
3. Position the switch in the rack as shown in Figure 6, providing temporary
support under the switch (use clamps if necessary).
4. To secure the front brackets to the rack’s front rails, attach the right front
bracket (Item 8) to the right front rack rail using two 10-32 x 3/8 inch screws
(Item 5) and two retainer nuts (Item 6).
5. Repeat step 4 to attach the left front brackets (Item 1) to the left front rack rail.
6. Tighten all screws and torque to 25-inch pounds.
1 Left front bracket
2 Left rear bracket
3 6-32 x 5/16” pan head Phillips screws
4 Right rear bracket
5 10-32 x 38” pan head Phillips screws
6 Retainer nuts
7 6-32 x 5/16” pan head Phillips screws
8 Right front bracket
SHR-2501
A
3
5
4
2
6
7
8
1