HP (Hewlett-Packard) TC4100 Server User Manual


 
38
Chapter 3 Installing and Configuring
10. Connect the power cable and the appropriate data cable (SCSI) from the system board or SCSI controller
to the device.
11. The air flow guide, the fan assembly, and the fan cage may need to be removed to access the back of the
drive cage to connect the drive data and power cables.
12. Replace the cover(s) and front bezel.
13. If the Server is rack mounted, slide it back into the rack and secure it.
14. Return power to the Server and run the Setup Utility to configure the device.
Selecting SCSI Tape Drives
Table 3-2 lists the supported tape drive models with their respective part number, size (half height or full
height), and the Hp Server location in which the tapes are supported. Figure 3-12 displays linear drawings of
the HP Server tc4100 rack and pedestal versions with the locations for the different SCSI Tape Drive models.
UseFigure 3-12 to match the codes on the “Supported Location” column of Table 3-2.
NOTE Tape drives do not come with the mounting hardware that is required for installation. Be
sure to order the appropriate mounting kit (HP product number Q1447A).
Table 3-2. SCSI Tape Drives Specification
DRIVE Size Part No. Supported Location Comments
DLTVS 80i Half Height C7405A R1 or R2, P2 or P3 Use the plastic drive rails
when installing.
DAT 40i Half Height C56864A R1 or R2, P2 or P3 Use the plastic drive rails
when installing.
Ultrium 215i Half Height C7420A R1 or R2, P2 or P3 Use the metal drive rails
when installing on the server.
DAT 24i Half Height C1555D R1 or R2, P2 or P3 Use the metal drive rails
when installing on the server.
DAT 24x6i Full Height C5677B R1 and R2, P2 and P3
(Two HH slots are required)
Use the metal drive rails
when installing on the server.
Ultrium 230i Full Height C7400A R1 and R2, P2 and P3
(Two HH slots are required)
If this drive is installed in
position P2 or P3, it is
necessary to remove the
power protection bracket of
the server.
Drive will extend slightly
from the front of the server.
Use the metal drive rails
when installing on the server.
DAT 40x6i Full Height C5677A R1 and R2, P2 and P3
(Two HH slots are required)
If this drive is installed in
position P2 or P3, it is
necessary to remove the
power protection bracket of
the server.
Use the metal drive rails
when installing on the server.