Honeywell 6100 Laptop User Manual


 
10 - 4
Mounting the ChargeBase
Set the ChargeBase on a dry, stable surface, such as a desktop or workbench near an electrical outlet.
Be sure to provide enough workspace with good lighting for the user to view and operate the Dolphin ter-
minal while it is in the ChargeBase. When choosing a location, bear in mind that the mounting location
must allow users easy access to the terminal wells and the power jack.
Bottom Panel
Desk Mounting
The DIN Rail (7.5 X 35 mm) slot on the bottom panel enables secure mounting on a horizontal surface.
Hardware Required
3/16 in. dia x 5/8 in. long pan head screw
1/2 in. OD x 7/32 in. ID x 3/64 in. thick washer
3/16 in. dia nut
Installing the DIN Rail
1. Slide the DIN Rail into the DIN Rail slot on the bottom panel of the base.
2. Turn the base and DIN Rail right side up.
DIN Rail Slot
Rubber Feet, Qty. 6
Serial Number and Compliance
Label