IBM 9308 Personal Computer User Manual


 
1. See the hub documentation for detailed installation information.
2. Attach the hub to its mounting tray with the four screws provided.
3. Install the tray and hub in the rear of the rack cabinet, using M6 screws and
cage nuts that come with the hub.
4. Attach the filler panel to the front of the rack cabinet, using M6 screws and cage
nuts that come with the hub.
5. See the hub documentation for information on how to connect cables.
Installing an SP switch
The SP
switch installs on fixed rails in your rack cabinet and occupies 2U of rack
mounting space. See the documentation that comes with the switch for detailed
installation instructions. Use the following general procedure to install an SP switch
in a rack cabinet:
Filler panel
Filler panel screws
Hub
Shelf screws
Rear of shelf
Figure 35. Installing a Fibre Channel hub
116 Hardware Maintenance Manual: IBM PC Server/Enterprise Racks Types 9306, 9308