IBM 9308 Personal Computer User Manual


 
You can install a console switch inside the rear storage compartment NetBAY
monitor shelf, vertically in the side of your rack cabinet, or horizontally within 1U of
EIA mounting space in your rack cabinet.
Note: If you install a 2x8 Console Switch inside the monitor shelf, you will not be
able to use the B port on the console switch to connect a second monitor,
keyboard, and mouse.
The following parts come with the console switch:
1x4 Console Switch 2x8 Console Switch
Two vertical mounting brackets Two vertical mounting brackets
Miscellaneous hardware kit (for attaching
brackets and installing the console switch
in a rack cabinet)
Two horizontal mounting brackets, marked ’L’
and ’R’ (Left and Right)
One 1.8 m (6 ft) power cord Miscellaneous hardware kit (for attaching
brackets and installing the console switch in a
rack cabinet)
One 1.5 m (4.9 ft) IEC connector power
cable
One 1.8 m (6 ft) power cord
Apex User Guide CD One 1.5 m (4.9 ft) IEC connector power cable
IBM NetBAY Console Switch Installation
Instructions Manual
Apex User Guide CD
IBM NetBAY Console Switch Installation
Instructions Manual
Note: A NetBAY Console Cable Set is required for each server that you will
connect to a console switch, or for each console switch you will connect to
1
A
2
3
4
Figure 41. 1x4 console switch
8
1
A
2
3
4
5
6
7
Figure 42. 2x8 console switch
122 Hardware Maintenance Manual: IBM PC Server/Enterprise Racks Types 9306, 9308